CD-IA-3.2.4 Results of the Second Validation
In this document, Deliverable CD-IA-3.2.4 “Results of the Second Validation” we report the validation of the integration of the IRF building blocks, i.e., the results of task T-IA-3.2.1. This deliverable describes the vision and strategy of the work package WP-IA-3.2 (using the Description of Work Amendment #4 as basis). A description of the work package’s roadmap until the end of the S-Cube project is given, including the validation strategy and the interaction with other WPs. The validation method is introduced and applied to the IRF. The results of this application are listed. Finally, the summarized results and the conclusions are presented.
CD-IA-3.2.4_Results of the Second Validation.pdf
—
PDF document,
578Kb










